Houston, TX  Interior Construction Mon-Fri|Log in
Start your project
Our crews

Framing

Our own framing crew, walls plumb and openings right, checked by our superintendent before the next trade starts.

Framing job site photo. Recommended 1600x900.
← Back to our crews

Bad framing is cheap to fix on day three and expensive to fix on day thirty, once drywall, tile and cabinets are hanging on it. We frame with our own crew so our superintendent can walk the walls before anyone covers them. A corner that is out of square gets pulled and reset that afternoon, not discovered by the millwork installer six weeks later.

The framing crew works from the same schedule we keep for the rest of the job. When rough-ins are due in a corridor on Monday, the walls are standing and blocked by Friday, because the crew is ours to direct and the date was built backward from the day the space opens.

What we do

Walls and partitions

Interior partitions and demising walls laid out to the drawings and checked for plumb and square before rough-in.

Openings

Door, window and mechanical openings framed to the schedule sizes so nothing gets recut on install day.

Backing and blocking

Blocking placed where the casework, grab bars, TVs and headboards will actually land.

Paced to the date

Framing released floor by floor so the trades behind it never stand around waiting.

Building something?

Send us your scope, or apply to join our trade network.

Start your project